Jump to content

Shaunengland

Non-Member
  • Posts

    5
  • Joined

  • Last visited

    Never

Shaunengland's Achievements

Rookie

Rookie (2/14)

  • First Post
  • Conversation Starter

Recent Badges

0

Reputation

  1. Hi all, i am rebuilding my doors after painting and am stuck with the tie rod that goes in between the front and rear window channels. When taking the doors apart I found the rods sat in the bottom of the doors so have no reference to refit them from. Looking at the canleys parts diagrams I can see which way around the rod goes and I am assuming the end that is bent back on itself and goes around the rear channel but dont know how far up the channel it sits. The front end on the rod has a ring which a bolt goes through but which one? Finally canleys show a trim clip next to the middle of the bar to tension it, but where does the clip fit? sorry for all the questions, if anyone has a photo it would be fantastic!
  2. HI all, Thanks again for the replies. I have already fitted Chig Doig double skinned treadplates and have replaced most of the treadplate that is on the bulkhead with new metal. I have 5-10mm "gap" between the 2 ends (no a gap as such as there is no hole if you get what I mean) I just though I should make it a bit more presentable and waterproof before painting!   Thanks Shaun
  3. Thanks for the reply, I have the rubber strip for in between the floors and the outrigger, I will look for for kind of flexible sealant for the join, although I suspect it may need a couple of spots of weld to hold the treadplate in the correct position.  
  4. Hi all, I am currently halfway through my herald restoration and could do with a few opinions. I am at the point where I am lining up the body which is fine, but I am stumped as to what to do with the part of the treadplate where the tub overlaps the bulkhead. Do people fill this or weld or or something else? Any help/photos would be great thank you!
×
×
  • Create New...